What is the footprint of Mistral Large 3? Mistral Large 3 emits about 290 g of CO₂e, uses 11.3 L of water and 2.5 kWh of electricity per million generated tokens. Per million input tokens: 48 g of CO₂e, 1.9 L of water, 424 Wh. Public price: €1 per million generated tokens, €0.44 for input.

Factors ecologits-0.10.2-replay-2026-09, updated on , medium confidence. Sources and equations in the methodology.

Key figures, per million tokens

EnergyCO₂eWaterPrice
Input tokens424 Wh48 g1.9 L€0.44
Generated tokens2.5 kWh290 g11.3 L€1

Of the 26 models in the TokenClimate registry, Mistral Large 3 ranks 9th for carbon intensity per million generated tokens, below the median (681 g). The gap with GPT-6 Luna, the registry's most frugal, is still ×12.

One million generated tokens represents about 2 km in a combustion car.

Frequently asked questions

How much CO₂e for 1 million tokens with Mistral Large 3?

About 290 g per million generated tokens and 48 g per million input tokens (factors ecologits-0.10.2-replay-2026-09 of the TokenClimate registry).

Where do these figures come from?

Factors published in TokenClimate's versioned registry, each with its citation on this page. The full equations and parameters are in the public methodology, at tokenclimate.com/en/methodology.

What is the confidence level?

Medium confidence: derived from a fitted model, or a partial fit completed by a convention.

How can you measure your organisation's real usage?

The TokenClimate dashboard connects to your organisation's Anthropic, OpenAI or OpenRouter admin keys (stored encrypted) and measures cost and CO₂e per team and per model. You can see it in the demo: tokenclimate.com/demo. Locally, the open source plugin claude-carbon measures a Claude Code session.

Sources and method

Energy per token

The per-token energy factor behind the figures above, published with its citation. (Mistral Large 3, fiche Hugging Face)

Infrastructure parameters

Datacenter parameters applied to this provider (the equations live in the methodology). (WRI 2020, water use embedded in purchased electricity)

PUE1.16
Grid carbon intensity (CIF)0.056 kgCO₂e/kWh
On-site water (WUE)0.18 L/kWh
Off-site water (EWIF)3.67 L/kWh
Amortised manufacturing (embodied)49 gCO₂e/kWh

Price

Public provider prices. (mistral.ai/pricing)